CO2 Footprint

 

Introduction

As a works contractor, Van Leeuwen Zwanenburg Sloopwerken specialises in renovation demolition. This requires the capacity to work per square metre. It is also mainly indoors. As far back as 2006, this led to the idea of an electrically powered mini-excavator in collaboration with a mechanical engineer. The original reason for switching to electrification was to prevent workers from being exposed to diesel engine emissions (DME), so for occupational health reasons. It was not yet apparent at the time that this would an additional advantage in terms of energy consumption because the required power was supplied by diesel-driven generators. CE marking was a problem that was only overcome in 2010 with the first factory-made electrically powered mini-excavators.

Besides this transition to improve working conditions, there was another development that involved the replacement of diesel-driven air compressors for powering pneumatic sledgehammers with electrically-driven compressors in 2017 and perhaps the most dramatic development was the replacement of the many halogen construction lamps with LED carousel lights in 2018. Halogen lighting is pleasant in winter but compared to the light output the heat loss is also an aspect of the transition aimed at improving working conditions.

Until that point, the company had had an intuitive approach to electrification, which led to the realisation that electrification was not just a way of improving working conditions but that it also had a positive effect on energy consumption. If companies want to implement this consistently in their business operations, they must tackle it systematically.

After quality management, health management, safety management and environmental management, energy management is the logical extension of the existing structure of the Business Management System. It lends itself well to integration and cost awareness.

 

The 2021 Footprint is also the reference year:

The following footprint was determined on the basis of the energy survey. The improvement plan is based on 2020 as a reference year.

Grand total VLZS en VLZF

2018

2019

2020

2025

2020%

Reduct.

Scope 1 Fossiele brandstoffen

201

223

224

200

63

25

Scope 2 Aardgas werkplaats/kantoor

23

20

28

23

8

4

Scope 3 Fossiele brandst.uitbesteed transp.

71

92

102

94

29

8

Totaal ton CO2 per jaar

295

335

354

305

 

 

Reductiemogelijkheid volgens energieplan

 

 

 

 -/- 14 %

 

-/- 36 ton

 The footprint was verified by the Certification Body at level 3.

The 2020-2025 energy reduction plan

Opportunities for energy reduction can be deduced from the energy survey. These opportunities can be described in terms of quality and determined in terms of quantity.

The following measures are planned to achieve the reduction target over the next five years.

Post

Plan

Do

Tijdpad

Reductie

Act

1

Strategische doelstelling

 

 

Ton CO2

Drager

1.1

Vervanging materieel BBT

Investeringen

2025

1,7

Directie

2

Tactische doelstelling

 

 

 

 

2.2

Reductie inkoop footprint van diesel eigen transport met 10%

Keuze van de leverancier/ brandstof

2022

14,0

Directie

 

Reductie inkoop footprint van elektriciteit met 10%

Overstap Alternatieve brandstoffen

2022

2,8

Directie

2.3

Reductie inkoop transport footprint t.b.v. de bedrijfsvoering met 10%

Inkoopvoorwaarden

2023

7,6

Directie

3

Operationele doelstelling

 

 

 

 

3.1

Brandstofefficientie verbeteren met 3%

Keuze van brandstof

2021

4,2

Inkoop

3.2

Verbruiksreductie op retail/ renovatieprojecten 10%

Verdergaande elektrificatie

2022

1

Uitvoerder

3.3

Verbruiksreductie op asbestprojecten 0%

 

-

 

Uitvoerder

3.4

Verbruiksreductie op bodemprojecten 0%

 

-

 

Uitvoerder

3.5

Verbruiksreductie op conventionele sloopprojecten 10%

 

2025

4,7

Uitvoerder

4

Individuele doelstellingen

 

 

 

 

 

Totale reductie mogelijkheid 2020-2025

 

 

36

ton

Participation

To realise the strategic objectives, it is necessary to participate in knowledge networks and industry initiatives. After all, when we share knowledge we all progress.

VLZS is a member of VERAS. This trade association has a “Sector Initiative CO2 Performance Ladder”.

We are also a member of the AYOP knowledge platform that brings together contractors, schools, governments and designers in the Amsterdam port region with the focus on sustainability in general.

The individual objectives will be emphasised in the vocational training courses and will focus on raising awareness in the field of energy savings. The required volumes will be determined during the upcoming assessment periods.

Initiatives

The replacement of the fleet began in 2017 with the best available technology, electrically-driven and battery-powered construction machines. With 2020 as the reference year, only the fleet of delivery vans now needs to be replaced.

Van Leeuwen Sloopwerken Zwanenburg sees this as an opportunity to start using fully electric vans for a number of its permanent maintenance contracts.

The gradual introduction of hybrid passenger cars started with the replacement of the lease cars. These initiatives will definitely lead to a more far-reaching reduction than specified in the 2020-2025 Energy Reduction Plan.

Communication

Van Leeuwen Zwanenbrug Sloopwerken communicates its policy and objectives and initiatives to its stakeholders in the following ways:

Additional information or details can be found on the website www.skao.nl

Innovative in:

  • Demolition work
  • Asbestos removal
  • Soil and water remediation
  • Especially in an operational environment
We are the only contractor with a special Retail Slooptrailer. This trailer has everything you need to completely demolish a retail or business space and make it ready for handover in the shortest possible time.

Read More

Innovative for:

  • Retail / Supermarket chains
  • Construction / Project developers / Industry
  • Aviation / Maritime & Offshore
  • Healthcare / Governments / Non-Profit
  • Cultural heritage / Special structures
  • Financial and Legal Institutions
  • Infrastructure

Visiting address:
Venenweg 6
1161 AK Zwanenburg
T. +31 (0)20 - 497 23 85
F. +31 (0)20 - 497 40 34
E. info@vlzs.nl

Mailing address:
Postbus 50
1160 AB Zwanenburg